| Code |
Condtions |
| X27 |
This right is limited to the irrigation of 202 acres within the place of use described above in a single irrigation season. |
| X35 |
Rights 36-2207, 36-2567, 36-2674, 36-10197, and 36-15179 when combined shall not exceed a total diversion rate of 8.6 cfs, a total annual maximum diversion volume of 1964 af at the field headgate, and the irrigation of 491 acres.
|
|
Rights 36-2567 and 36-2674 are limited to the irrigation of 222 acres within the place of use described above in a single irrigation season. |
|
Right no. 36-15179 is an enlargement of right nos. 36-02207, 36-02567, 36-02674 and 36-10197 pursuant to section 42-1426, Idaho code.
|
| R64 |
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands above. |
| R02 |
A lockable device subject to the approval of the Department shall be maintained on the diverting works in a manner that will provide the watermaster suitable control of the diversion. |
| R05 |
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District 130. |
| 213 |
Upon specific notification of the Department, the right holder shall install and maintain data loggers to record water usage information at the authorized point(s) of diversion in accordance with Department specifications. |
| 214 |
Prior to the diversion and use of water under Transfer approval #75176, the right holder shall install and maintain acceptable measuring device(s) at the authorized point(s) of diversion in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device. |
| X61 |
The period of use for the irrigation described in this approval may be extended to a beginning date of March 15 and an ending date of November 15 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water before April 1 and after October 31 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than November 4, 2002.
|
| T07 |
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval. |
| T08 |
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer. |
| T19 |
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree. |