Priority Date : 5/1/1955
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
01S
34E
31
0
NE
NW
BINGHAM
GROUND WATER
01S
34E
31
0
SE
NW
BINGHAM
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
10/31
3.64 CFS
968.00 AFA
TOTAL
3.64 CFS
968.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BINGHAM county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
01S
34E
31
NW
NE
40.0
01S
34E
31
SW
NE
40.0
01S
34E
31
NE
NW
40.0
01S
34E
31
1
NW
NW
39.0
01S
34E
31
2
SW
NW
18.0
01S
34E
31
SE
NW
33.0
01S
34E
31
NE
SW
10.0
01S
34E
31
NW
SE
22.0
Irrigation Totals
Total Acres
Acre Limit
242.00
Conditions
Code
Condtions
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 120.
R64
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands above.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.
R02
A lockable device subject to the approval of the Department shall be maintained on the diverting works in a manner that will provide the watermaster suitable control of the diversion.
131
Prior to the diversion and use of water under Transfer approval 73553, the right holder shall install and maintain acceptable measuring device, including data logger, at the authorized point of diversion and in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
Water Supply Bank
Lease Type: Contract
Lease ID: 1526
Lease Status: Active
Lease Start Date: 1/1/2022
Lease End Date: 12/31/2026