Priority Date : 10/31/1986
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
05N
36E
31
0
SE
NW
NE
BONNEVILLE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
10/31
0.27 CFS
74.00 AFA
TOTAL
0.27 CFS
74.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (JEFFERSON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
05N
36E
31
NW
SW
30.0
05N
36E
31
SW
SW
3.0
05N
36E
31
SE
SW
1.0
05N
36E
32
SW
NW
36.0
Irrigation Totals
Total Acres
Acre Limit
70.00
18.50
Conditions
Code
Condtions
K09
This right is for an enlargement of 18.5 acres within the place of use described for this right.
X35
Rights 35-14043 and 35-14049 when combined shall not exceed a total diversion rate of 1.03 cfs, a total annual maximum diversion volume of 280.0 af at the field headgate, and the irrigation of 70.0 acres.
067
The right holder shall measure and annually report diversions of water and/or other pertinent hydrologic and system information as required by Section 42-701, Idaho Code.
X63
All water rights within Basin 35 are from connected sources of water in the Snake River Basin and shall be administered conjunctively.
K02
This right is based upon an enlargement of Right No. 35-14049 pursuant to Section 42-1426, Idaho Code.
C11
This water right is subordinate to all water rights with a priority date earlier than April 12, 1994, that are not decreed as enlargements pursuant to Section 42-1426, Idaho Code. As between water rights decreed as enlargements pursuant to Section 42-1426, Idaho Code, the earlier priority right is the superior right.
F06
The following rights are diverted through point(s) of diversion described above: 35-14043, 35-14049.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.