| Code |
Condtions |
| K09 |
This right is for an enlargement of 6.6 acres within the place of use described for this right. |
| X35 |
Rights 35-13757, 35-13597 and 35-13600 when combined shall not exceed a total diversion rate of 4.75 cfs, a total annual maximum diversion volume of 1024 af at the field headgate, and the irrigation of 256 acres. |
|
Rights 35-13597 and 35-13600 when combined shall not exceed a total diversion rate of 1.14 cfs. |
| R02 |
A lockable device subject to the approval of the Department shall be maintained on the diverting works in a manner that will provide the watermaster suitable control of the diversion. |
| R05 |
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. As of May 11, 2007, this water right is within State Water District No. 120. |
| R64 |
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands above. |
| 131 |
Prior to the diversion and use of water under Transfer approval 72857, the right holder shall install and maintain acceptable measuring device(s), including data logger(s), at the authorized point(s) of diversion and in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device. |
| 046 |
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department. |
| K02 |
This right is based upon an enlargement of Right No. 35-13600 pursuant to Section 42-1426, Idaho Code. |
| C11 |
This water right is subordinate to all water rights with a priority date earlier than April 12, 1994, that are not decreed as enlargements pursuant to Section 42-1426, Idaho Code. As between water rights decreed as enlargements pursuant to Section 42-1426, Idaho Code, the earlier priority right is the superior right. |
| T07 |
The right holder shall accomplish the change authorized by transfer 72857 within one year of May 11, 2007. |
| T08 |
Failure of the right holder to comply with the conditions of transfer 72857 is cause for the Director to rescind approval of the transfer. |
| T19 |
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree. |