Priority Date : 4/1/1980
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
04S
32E
10
0
SW
SE
NE
BINGHAM
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
4/01
10/31
0.18 CFS
40.00 AFA
TOTAL
0.18 CFS
40.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BINGHAM county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
04S
32E
10
NE
NE
28.0
04S
32E
10
NW
NE
29.0
04S
32E
10
SW
NE
25.0
04S
32E
10
SE
NE
22.0
Irrigation Totals
Total Acres
Acre Limit
104.00
Conditions
Code
Condtions
X35
Rights 35-7609 and 35-10322 when combined shall not exceed a total diversion rate of 1.88 cfs, a total annual maximum diversion volume of 416 af at the field headgate, and the irrigation of 104 acres.
R64
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the place of use.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 120.
214
Prior to the diversion and use of water under Transfer approval 79930, the right holder shall install and maintain acceptable measuring device(s) at the authorized point(s) of diversion in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device.
213
Upon specific notification of the Department, the right holder shall install and maintain data loggers to record water usage information at the authorized point(s) of diversion in accordance with Department specifications.
C11
This water right is subordinate to all water rights with a priority date earlier than April 12, 1994, that are not decreed as enlargements pursuant to Section 42-1426, Idaho Code. As between water rights decreed as enlargements pursuant to Section 42-1426, Idaho Code, the earlier priority right is the superior right.
K02
This right is based upon an enlargement of Right No. 35-7609 pursuant to Section 42-1426, Idaho Code.
K09
This right is for an enlargement of 10 acres within the place of use described for this right.
F06
The following rights are diverted through point(s) of diversion described above: 35-7609 and 35-10322.
E02
Use of this right is combined with water from Aberdeen Springfield Canal Co.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.