Priority Date : 2/24/1980
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
04N
26E
23
0
SW
SW
SE
BUTTE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
4/01
11/01
1.04 CFS
183.00 AFA
TOTAL
1.04 CFS
183.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BUTTE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
04N
27E
32
NE
SE
21.5
04N
27E
32
NW
SE
28.8
04N
27E
32
SW
SE
40.0
04N
27E
32
SE
SE
40.0
Irrigation Totals
Total Acres
Acre Limit
130.30
52.30
Conditions
Code
Condtions
X27
This right is limited to the irrigation of 52.3 acres within the authorized place of use in a single irrigation season.
X35
Rights 34-172F, 34-313A, 34-446C, 34-503D, and 34-7226C when combined shall not exceed a total diversion rate of 3.326 cfs and the irrigation of 130.3 acres.
SF2
This water right enjoys the benefit of subordination of hydropower water right nos. 02-00100, 02-4000A, 02-4001A, 02-02032A, 02-4000B, 02-4001B, 02-02032B, 02-02036, 02-02056, 02-02065, 02-02064, 02-10135, 02-02060, 02-02059, 02-02001B, 02-02001A, 02-02057, 37-02128, 37-02472, 37-02471, 37-20710, 37-20709, 36-02013, 36-02018 and 36-02026 only so long as the average daily flows as measured at the Murphy Gaging station meet or exceed the minimum stream flows established by state action.
Water is injected into the Arco Canal at a point above the measuring gauge used by the watermaster in delivery of water to the Arco Canal.
F01
Water is delivered through Arco Canal.
F06
The following rights are diverted through point(s) of diversion described above: 34-7226B, 34-7226C and 34-7226D.
C05
Right includes accomplished change in place of use pursuant to Section 42-1425, Idaho Code.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.