Priority Date : 4/18/1977
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
06N
24E
2
0
SW
SW
NE
CUSTER
GROUND WATER
06N
24E
2
0
SW
SW
NE
CUSTER
Injection
GROUND WATER
07N
24E
33
0
NW
SW
NE
CUSTER
Rediversion
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/15
10/15
3.68 CFS
1095.50 AFA
TOTAL
3.68 CFS
1095.50 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (CUSTER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
06N
24E
2
NE
SW
38.0
06N
24E
2
NW
SW
34.0
06N
24E
2
SW
SW
37.5
06N
24E
2
SE
SW
37.0
06N
24E
11
SW
NE
10.0
06N
24E
11
SE
NE
19.0
06N
24E
11
NE
NW
2.0
06N
24E
11
NW
NW
3.0
06N
24E
11
NE
SE
40.0
06N
24E
11
NW
SE
40.0
06N
24E
11
SW
SE
27.0
06N
24E
11
SE
SE
25.5
Irrigation Totals
Total Acres
Acre Limit
313.00
Conditions
Code
Condtions
X35
Rights 34-7182, 34-10933, 34-10236 and 34-10950 when combined shall not exceed a total annual maximum diversion volume of 1095.5 af at the field headgate and the irrigation of 313 acres.
R59
This right when combined with all other rights shall provide no more than 3.5 afa per acre at the field headgate for irrigation of the lands above.
R02
A lockable device subject to the approval of the Department shall be maintained on the diverting works in a manner that will provide the watermaster suitable control of the diversion.
Measuring devices and lockable controlling works of a type acceptable to IDWR shall be permanently installed and maintained at the points of injection and rediversion.
S41
The use of water for irrigation under this right may begin as early as April 1 and may continue to as late as October 31, provided other elements of the right are not exceeded. The use of water before April 15 and after October 15 under this remark is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than 2/6/2002.
F01
Water diverted from the Big Lost River delievered through the Darlington Ditch.
G03
Water diverted under this right is exchanged by injecting water diverted under this right into the Big Lost River at the point of injection described above, and diverting an equal amount from the Big Lost River at the upstream point of rediversion described above.
213
Upon specific notification of the Department, the right holder shall install and maintain data loggers to record water usage information at the authorized point(s) of diversion in accordance with Department specifications.
214
Prior to the diversion and use of water under Transfer approval 75423, the right holder shall install and maintain acceptable measuring device(s) at the authorized point(s) of diversion in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 34.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T19
Pursuant to Idaho Code § 42-1412(6), this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as determined by the Snake River Basin Adjudication court in the final unified decree entered 08/26/2014.