Priority Date : 6/1/1920
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BIG LOST RIVER
SINKS
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BIG LOST RIVER
04N
26E
26
0
NW
NW
NW
BUTTE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
05/01
10/15
0.01 CFS
TOTAL
0.01 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (BUTTE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
03N
27E
7
4
SW
SW
1.0
03N
27E
7
SE
SW
1.0
Irrigation Totals
Total Acres
Acre Limit
2.00
Conditions
Code
Condtions
X35
Rights 34-13711, 34-13713 and 34-13715 when combined shall not exceed a total diversion rate of 0.04 cfs, and the irrigation of 2 acres.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 34.
The period of use for the irrigation described in this approval may be extended to a beginning date of 4/01 and an ending date of 10/31 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water before 5/01 and after 10/15 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than 12/14/2001.
Water delivered through Munsey Ditch.
R63
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the lands above.
T07
The right holder shall accomplish the change authorized by this transfer within one (1) year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.