Priority Date : 5/1/1928
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
ALDER CREEK
BIG LOST RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
ALDER CREEK
06N
25E
7
3
NW
NW
SW
CUSTER
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
5 /01
10/15
5.00 CFS
TOTAL
5.00 CFS
Places of Use
Place of Use Legal Description : IRRIGATION (CUSTER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
06N
25E
16
NE
NW
16.2
06N
25E
16
NW
NW
21.8
06N
25E
16
SW
NW
34.3
06N
25E
16
NW
SW
18.6
06N
25E
16
SW
SW
41.1
06N
25E
17
SE
NE
8.2
06N
25E
17
NE
SE
8.6
06N
25E
17
SE
SE
6.0
06N
25E
20
1
NE
NE
6.8
06N
25E
21
3
NE
NW
26.7
06N
25E
21
4
NW
NW
40.2
Irrigation Totals
Total Acres
Acre Limit
228.50
Conditions
Code
Condtions
X35
Rights 34-119E, 34-381C, 34-680A, 34-682B, 34-10392, 34-10396 and 34-10400 when combined shall not exceed a total diversion rate of 6.86 cfs and the irrigation of 228.5 acres.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 34.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
S34
The period of use for irrigation described above may be extended in seasons of unusual characteristics to a beginning date of 04-20 and an ending date of 10-31 at the discretion of the Director of the Idaho Department of Water Resources.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.