| 027 |
Use of water under this right shall be non-consumptive. |
| 025 |
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required. |
| R04 |
Use of water under this water right will be regulated by the watermaster of State Water District No. 32D. |
| 001 |
A measuring device and lockable controlling works of a type acceptable to the Department shall be permanently installed and maintained as part of the diverting works. A second measuring device shall be maintained near the end of the feeder ditch so that the amount of water lost in the feeder ditch can be determined. |
| R22 |
The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right. |
| X43 |
The diversion and use of water for hydropower purposes under this license is subject to review by the Director after the date of expiration of license 7194-001 issued by the Federal Energy Regulatory Commission. Upon appropriate findings relative to the interest of the public, the Director may cancel all or any part of the use authorized herein and may revise, delete or add conditions under which the right may be exercised. |
|
The right holder shall maintain the pond and irrigation system that utilizes 0.11 cfs of water, described in the BLMs Finding of No Significant Impact and Decision/Rationale, EA Number ID-030-9-46 (January 11, 1990) including but not limited to 6 to 8 ponds below the hydropower diversion that create 2.46 acres of riparian habitat.
|
|
If the right holder does not comply with Condition No. 7 listed above, the right holder shall build and maintain a gate in the hydropower diversion located in the SESW, S34, T9N, R30E, B.M. and shall allow 11% of the flow of Birch Creek or 5.0 cfs, whichever is smaller, to flow past the feeder canal diversion on Birch Creek, said water to remain in the natural channel of Birch Creek. |
|
Provisions shall be made to return the water to Birch Creek at the end of the first 1 1/2 mile of feeder ditch to assure that the section of feeder ditch will not be dewatered if the generator malfunctions or icing occurs or any other event necessitates that the water not be conveyed to the generator. |
|
The first 1 1/2 miles of ditch must be maintained and operated in a manner that supports a fishery as described in the report entitled Feasibility of Developing a Trout Population in the Proposed Birch Creek Hydroelectric Project Feeder Ditch written by J.S. Griffith, Ph.D, and found in the official record of application for this water right. |
|
The feeder canal shall be maintained in a manner that will reduce the amount of seepage loss by at least 11% of the flow at the point of diversion. |
| X36 |
Right 32-07128 is also diverted through the point of diversion described above. |