Priority Date : 4/23/1983
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
09N
34E
5
0
SE
SW
NE
CLARK
GROUND WATER
09N
34E
5
0
SE
SW
NW
CLARK
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
11/01
0.17 CFS
50.70 AFA
TOTAL
0.17 CFS
50.70 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (CLARK county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
09N
34E
5
1
NE
NE
30.4
09N
34E
5
2
NW
NE
30.4
09N
34E
5
SW
NE
30.4
09N
34E
5
SE
NE
30.4
09N
34E
5
3
NE
NW
30.4
09N
34E
5
4
NW
NW
30.4
09N
34E
5
SW
NW
30.4
09N
34E
5
SE
NW
30.4
09N
34E
5
NE
SW
30.4
09N
34E
5
NW
SW
30.4
09N
34E
5
SW
SW
30.4
09N
34E
5
SE
SW
30.4
09N
34E
5
NE
SE
30.4
09N
34E
5
NW
SE
30.4
09N
34E
5
SW
SE
30.4
09N
34E
5
SE
SE
30.4
Irrigation Totals
Total Acres
Acre Limit
486.40
14.50
Conditions
Code
Condtions
X27
This right is limited to the irrigation of 14.5 acres within the place of use described above in a single irrigation season.
WB4
The total instantaneous diversion of water from all points of diversion under Rights 32-7054A, 32-7091A, 32-7054B, 32-7091B and 32-13204 shall not exceed 7.03 cfs, nor total combined annual volume of 1702.4 af for the irrigation of 486.4 total acres.
067
The right holder shall measure and annually report diversions of water and/or other pertinent hydrologic and system information as required by Section 42-701, Idaho Code.
R63
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the lands above.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.