Water Right Report : 3-2048( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner EMBASSY INC C/O RICHARD M PHILLIPS PRES 3325 DAVIS DR MERIDIAN ID 83642
Original Owner BOODRY, CLAYTON ID
Original Owner BOODRY, GEORGE E ZZ

Water Right Status

Priority Date : 9/10/1959
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 06N 06W 13 8 SW SW CANYON
SNAKE RIVER 06N 06W 13 6 NE SE CANYON

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 4/01 11/01 5.98 CFS 1345.50 AFA
TOTAL 5.98 CFS 1345.50 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (CANYON county)
Township Range Section Lot QQQ QQ Q Acres
06N 06W 13 1 NE NE 14.0
06N 06W 13 2 NW NE 23.0
06N 06W 13 SW NE 40.0
06N 06W 13 SE NE 26.0
06N 06W 13 NE NW 0.5
06N 06W 13 3 NE NW 9.0
06N 06W 13 SE NW 15.0
06N 06W 13 NE SW 40.0
06N 06W 13 NW SW 40.0
06N 06W 13 SW SW 3.5
06N 06W 13 8 SW SW 23.0
06N 06W 13 SW SE 1.0
06N 06W 13 7 SW SE 8.0
06N 06W 14 NE SE 1.0
06N 06W 14 2 NE SE 50.0
Irrigation Totals
Total Acres Acre Limit
294.00

Conditions

Code Condtions
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
F06 The following rights are also diverted through the point of diversion located in T6N, R6W, Sec 13 NESE: 3-2051 & 3-2045.
S39 The use of water for irrigation under this right may begin as early as March 1 and may continue to as late as November 15, provided other elements of the right are not exceeded. The use of water before April 1 and after November 1 under this remark is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than the date a partial decree is entered for this right.
T06N, R06W S13 NENW, SWSE, SWSW & S14 NESE is unsurveyed, nonfederal land except where noted by GCDB lot number.
Dates
  • Licensed Date :
  • Decreed Date : 7/9/2007
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : NWD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False