Water Right Report : 3-10290( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner PECHT, BRYAN PO BOX 67 MIDVALE ID 83645-0067
Current Owner PECHT, MARIE PO BOX 67 MIDVALE ID 83645-0067
Original Owner GUTHRIE, MARY 30 OLTMAN RD PO BOX 622 WEISER ID 83672
Original Owner GUTHRIE, WILLIAM J 30 OLTMAN RD PO BOX 622 WEISER ID 83672

Water Right Status

Priority Date : 2/23/1968
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 11N 05W 31 3 SE NW WASHINGTON

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 03/15 11/15 0.07 CFS 19.80 AFA
TOTAL 0.07 CFS 19.80 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (WASHINGTON county)
Township Range Section Lot QQQ QQ Q Acres
11N 05W 20 NW SW
11N 05W 20 SW SW 4.4
Irrigation Totals
Total Acres Acre Limit
4.40

Conditions

Code Condtions
C18 This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
F06 The following rights are also diverted through point of diversion described above: 3-7001B, 3-7001D, 3-7001E, 3-10193, & 3-10194.
S47 The use of water for irrigation under this right may begin as early as March 1 provided other elements of the right are not exceeded. The use of water before March 15 under this remark is subordinate to all water rights having no subordinated early irrigation use and a priority date earlier than the date a partial decree is entered for this right.
P21 This right is a split from former right 3-7001A.
The actual diversion volume is 178.65 af.
Dates
  • Licensed Date :
  • Decreed Date : 7/9/2007
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : NWD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False