Priority Date : 3/4/1974
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
08S
31E
17
0
SW
NW
NE
POWER
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
10/15
3.95 CFS
1081.50 AFA
TOTAL
3.95 CFS
1081.50 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (POWER county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
08S
31E
8
SW
NE
32.2
08S
31E
8
SE
NE
37.0
08S
31E
8
SW
NW
15.0
08S
31E
8
SE
NW
37.0
08S
31E
8
NE
SW
36.0
08S
31E
8
NW
SW
14.0
08S
31E
8
SE
SW
0.1
08S
31E
8
NE
SE
9.0
08S
31E
8
NW
SE
9.2
08S
31E
8
SW
SE
32.0
08S
31E
8
SE
SE
31.0
08S
31E
9
SW
NW
18.0
08S
31E
9
NW
SW
0.4
08S
34E
17
NE
NE
29.0
08S
34E
17
NW
NE
8.9
Irrigation Totals
Total Acres
Acre Limit
308.80
Conditions
Code
Condtions
131
Prior to the diversion and use of water under Transfer approval 74496, the right holder shall install and maintain acceptable measuring device(s), including data logger(s), at the authorized point(s) of diversion and in accordance with Department specifications, or shall obtain an approved variance from the Department to determine the amount of water diverted from power records or to maintain an existing measuring device.
067
The right holder shall record the quantity of water diverted and annually report diversions of water and/or other pertinent hydrologic and system information as required by Section 42-701, Idaho Code.
R64
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands above.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.