Priority Date : 1/14/1983
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
02N
37E
36
0
NE
SW
BONNEVILLE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
INDUSTRIAL
01/01
12/31
0.07 CFS
17.10 AFA
TOTAL
0.07 CFS
17.10 AFA
Places of Use
Place of Use Legal Description : INDUSTRIAL (BONNEVILLE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
02N
37E
36
SW
NW
02N
37E
36
SE
NW
02N
37E
36
NE
SW
02N
37E
36
NW
SW
02N
37E
36
SW
SW
02N
37E
36
SE
SW
Conditions
Code
Condtions
205
The approval of transfer 85192 redefines all of the elements of this water right, and the new use of water authorized by this approval shall constitute the full extent of the right.
933
This right is for the use of trust water, and it is subject to review 20 years after its initial approval (10/18/1990) to re-evaluate the availability of trust water for the authorized use and to re-evaluate the public interest criteria for reallocating trust water.
SF2
This water right enjoys the benefit of subordination of hydropower water right nos. 02-00100, 02-4000A, 02-4001A, 02-02032A, 02-4000B, 02-4001B, 02-02032B, 02-02036, 02-02056, 02-02065, 02-02064, 02-10135, 02-02060. 02-02059, 02-02001B, 02-02001A, 02-02057, 37-02128, 37-02472, 37-02471, 37-20710, 37-20709, 36-02013, 36-02018 and 36-02026 only so long as the average daily flows as measured at the Murphy Gage station meet or exceed the minimum stream flows established by state action.
R05
Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 120.
212
Prior to diversion and use of water under Transfer approval 85192, the right holder shall install and maintain acceptable measuring device(s) at the authorized point(s) of diversion, in accordance with Department specifications.
213
Upon specific notification of the Department, the right holder shall install and maintain data loggers to record water usage information at the authorized point(s) of diversion in accordance with Department specifications.
X06
Industrial use is for a concrete mixing facility.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.