Priority Date : 2/15/1951
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
GROUND WATER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
GROUND WATER
03N
41E
8
5
NW
NW
BONNEVILLE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
04/01
10/31
0.02 CFS
6.50 AFA
TOTAL
0.02 CFS
6.50 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (BONNEVILLE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
03N
41E
8
5
NW
NW
5.8
03N
41E
8
SW
NW
0.2
Irrigation Totals
Total Acres
Acre Limit
6.00
2.00
Conditions
Code
Condtions
X59
Point of diversion and place of use are located within Lot 1, Blk. 1, Horseshoe Bend Subdivision.
X35
Rights 25-14291 and 25-14295 when combined shall not exceed a total annual maximum diversion volume of 8.0 af at the field headgate, and the irrigation of 2.0 acres.
X35
Rights 25-14291, 25-14293, 25-14295 and 25-14297 when combined shall not exceed a total annual maximum diversion volume of 24.0 af at the field headgate, and the irrigation of 6.0 acres.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
R64
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands above.
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
T07
The right holder shall accomplish the change authorized by this transfer within one year(s) of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.