| Code |
Condtions |
| 129 |
Place of use for irrigation from storage is within the area served by North Fork Reservoir Company which includes Egin Bench Canals Inc., Salem Union Canal Co., and Consolidated Farmers Canal Co., located within Madison and Fremont Counties, Idaho. |
| E56 |
The rights listed below are limited to the irrigation of a combined total of 41,098 acres in a single irrigation season. Combined Right Nos.: 21-110, 21-111, 21-112, 21-2154, 21-2161, 21-12946, 21-12897, 21-12908, 21-12910, 21-12912, 21-12921, 21-12922, 21-12928, 21-12934, 21-12961, 21-12962, 21-12909, 21-12923, 21-12924, 21-13193, 22-428, 22-13342, 22-13343, 22-13344, 22-13347, 22-13349. |
| 135 |
The boundary encompassing the place of use for this water right is described with a digital boundary as defined by I.C. Section 42-202B(2) and authorized pursuant to I.C. Section 42-1411(2)(h). The data comprising the digital boundary are incorporated herein by reference and are stored on a CD-ROM disk issued in duplicate originals on file with the SRBA District Court and the Idaho Department of Water Resources. A map depicting the place of use is attached hereto to illustrate the place of use described by the digital boundary. |
| G01 |
Point of injection into and point of rediversion from Henrys Fork. |
|
Place of use for storage is Henrys Lake, provided, however, that water under this right may be temporarily held in the unoccupied space of any of the reservoirs upstream of Milner Dam, located at township 10S, range 21E, sections 28 and 29, when determined by the Water District 01 Watermaster as supervised by the Director of the Department of Water Resources, the Water District 01 advisory committee, and the United States Bureau of Reclamation that such temporary storage will maximize the storage of water upstream of Milner Dam. |
| P21 |
This right is a split from former right 21-160. |
| C18 |
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code. |
| F02 |
Point of rediversion is Henrys Lake Dam. |
|
Total reservoir capacity is 90,000 acre feet when filled to elevation 6476.9 and measured at the upstream face of the dam.
Right Nos. 21-110, 21-111, 21-112, 21-2154 and 21-12946 are limited to a total combined annual diversion volume of 79,350 AF.
The rights listed below are limited to a total combined annual diversion volume of 90,000 AF. Combined Right Nos.: 21-110, 21-111, 21-112, 21-2154, 21-2161, 21-12946 and 21-13193. |
| B01 |
Source is also known as Dry Creek. |
| C03 |
Right includes accomplished change in point of diversion pursuant to Section 42-1425, Idaho Code. |
|
September 15th beginning date for this annual period is known as the “reset date” for reservoir volumes. The “reset date” allows previously satisfied reservoir water right volumes to begin filling again for the next annual storage volume period. The annual storage volume period will extend from September 15th to the following September 14th. Consistent with Section 8.3 of the 1990 Fort Hall Indian Water Rights Agreement, nothing in this provision is intended to impact the rights described and administered pursuant to that Section. |