Water Right Report : 2-7379( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070

Water Right Status

Priority Date : 3/31/1982
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 02S 01E 18 11 SE SE ADA

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 01/01 12/31 6550.00 CFS
TOTAL 6550.00 CFS

Places of Use

Place of Use Legal Description : POWER (ADA county)
Township Range Section Lot QQQ QQ Q Acres
02S 01E 18 11 SE SE

Conditions

Code Condtions
For purposes of the determination and administration of this water right, no portion of the waters of the Snake River or surface or ground water tributary to the Snake River upstream from Milner Dam shall be considered.
913 The term of this water right shall run concurrently with Swan Falls Hydroelectric license Project No. 503 issued by the Federal Energy Regulatory Commission (FERC), which expires on September 1, 2042. The term shall automatically extend to run concurrently with any annual renewals of the project's FERC license. Prior to the issuance of a subsequent or new FERC license for the project, the Director may review the water right license and may issue an order canceling all or any part of the use, establishing a new term, or revising, adding or deleting conditions under which the water right may be exercised. The order shall take effect on the date the current term, as may be extended through annual renewals, expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the project's subsequent or new FERC license and any prior conditions on the water right license shall remain in effect.
R22 The water right acquired under this license for hydropower purposes shall be junior and subordinate to all rights to the use of water, other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights to the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
027 Use of water under this right shall be non-consumptive.
R05 Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District 02.
Power generation is at the Swan Falls Dam power plant.
This right is specifically subject to the agreement among the state of Idaho, the Governor, the Attorney General and Idaho Power Co. dated October 25, 1984. It is also subject to the contract between the state of Idaho and the Idaho Power Co. dated October 25, 1984.
Without regard to the right granted to the right holder to the beneficial use of 6550 cfs pursuant to license 02-7379, water may only be claimed and used thereunder if and when the water is physically available and such right shall not give rise to any claim on the part of the right holder to a flow requirement in the Snake River which exceeds 3,900 cfs during the summer season and 5,600 cfs during the winter season as specified in the above described agreement and contract.
Diversion and use of water by the reconstructed Swan Falls power project shall be pursuant to water rights held by the right holder (including permit 02-7379) and as such rights are modified by the agreement and contract and not otherwise.
Dates
  • Licensed Date : 4/4/2014
  • Decreed Date :
  • Permit Proof Due Date : 4/1/1996
  • Permit Proof Made Date : 4/1/1996
  • Permit Approved Date : 4/10/1989
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 3/31/1982
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : 02
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False