Water Right Report : 2-7375( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070

Water Right Status

Priority Date : 4/9/1982
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 10S 18E 4 3 NE NW TWIN FALLS

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 01/01 12/31 3960.00 CFS
TOTAL 3960.00 CFS

Places of Use

Place of Use Legal Description : POWER (TWIN FALLS county)
Township Range Section Lot QQQ QQ Q Acres
10S 18E 4 NE NW

Conditions

Code Condtions
Power generation is at the Twin Falls power plant.
R05 Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 02.
027 Use of water under this right shall be non-consumptive.
R22 The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
For purposes of the determination and administration of this water right, no portion of the waters of the Snake River or surface or ground water tributary to the Snake River upstream from Milner Dam shall be considered.
913 The term of this water right shall run concurrently with Twin Falls Project license 18-000 issued by the Federal Energy Regulatory Commission (FERC), which expires on December 31, 2040. The term shall automatically extend to run concurrently with any annual renewals of the project's FERC license. Prior to the issuance of a subsequent or new FERC license for the project, the Director may review the water right license and may issue an order canceling all or any part of the use, establishing a new term, or revising, adding or deleting conditions under which the water right may be exercised. The order shall take effect on the date the current term, as may be extended through annual renewals, expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the project's subsequent or new FERC license and any prior conditions on the water right license shall remain in effect.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
Dates
  • Licensed Date : 4/11/2014
  • Decreed Date :
  • Permit Proof Due Date : 5/1/1998
  • Permit Proof Made Date : 3/23/1998
  • Permit Approved Date : 4/8/1993
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 4/9/1982
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : 02
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False