Water Right Report : 2-2259( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner SUNDBERG, SHERWIN R PO BOX 183 GRAND VIEW ID 83624-0183
Current Owner SUNDBERG, TANYA PO BOX 183 GRAND VIEW ID 83624-0183
Original Owner PETROLEUM CONSTRUCTION INC C/O RUSSELL FOX PO BOX 592 SANTA PAULA CA 93060
Original Owner PULLEN JR, ROBERT L PO BOX 451 GRAND VIEW ID 83624
Original Owner STEINER, REX G HC 89 BOX 2165 OREANA ID 83650
Previous Owner JAMES, MICHAEL L 21610 ROBINSON RD OREANA ID 83650
Previous Owner JAMES, RHONDA J 21610 ROBINSON RD OREANA ID 83650

Water Right Status

Priority Date : 12/18/1963
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 04S 02E 8 4 SE NE OWYHEE

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 04/01 10/31 1.50 CFS 375.00 AFA
TOTAL 1.50 CFS 375.00 AFA

Places of Use

Place of Use Legal Description : IRRIGATION (OWYHEE county)
Township Range Section Lot QQQ QQ Q Acres
04S 02E 18 NE NE 36.0
04S 02E 18 SE NE 39.0
Irrigation Totals
Total Acres Acre Limit
75.00

Conditions

Code Condtions
T07 The right holder shall accomplish the change authorized by this transfer within one year(s) of the date of this approval.
T08 Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T19 Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree.
01M After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
X61 The period of use for the irrigation described in this approval may be extended to a beginning date of 3/1 and an ending date of 11/15 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water before 4/1 and after 10/31 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than 6/15/2009.
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 5.0 afa per acre at the field headgate for irrigation of the place of use.
F06 The following rights are diverted through point of diversion described above: 2-2259, 2-2261A, 2-2261C, 2-2261D, 2-10399, 2-10421, 2-10423, 2-10611 & 2-10612.
Dates
  • Licensed Date :
  • Decreed Date : 6/15/2009
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : 02
  • Generic Max Rate Per Acre : 0.02
  • Generic Max Volume Per Acre : 5
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False