Priority Date : 6/21/1950
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
SNAKE RIVER
COLUMBIA RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
SNAKE RIVER
05S
04E
34
4
SW
NW
ELMORE
SNAKE RIVER
05S
04E
34
10
NW
SW
OWYHEE
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
01/01
12/31
15420.00 CFS
TOTAL
15420.00 CFS
Places of Use
Place of Use Legal Description : POWER (OWYHEE county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
05S
04E
33
5
NE
SE
Conditions
Code
Condtions
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
162
Power generation is at the C.J. Strike Dam Power Plant.
The rights herein granted are subject to the condition that the project shall be operated in such manner as will not conflict with future depletion in flow of the waters of Snake River and its tributaries, or prevent or interfere with the future upstream diversion and use of such waters, for the irrigation of lands and other beneficial consumptive uses in the Snake River watershed.