Water Right Report : 2-201( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner STATE OF IDAHO IDAHO WATER RESOURCE BOARD CYNTHIA BRIDGE CLARK PO BOX 83720 BOISE ID 83720-0098

Water Right Status

Priority Date : 12/29/1976
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 01S 01W 35 5 NW SE ADA

Water Uses

Beneficial Use From To Diversion Rate Volume
MINIMUM STREAM FLOW 1/01 12/31 3300.00 CFS
TOTAL 3300.00 CFS

Places of Use

Conditions

Code Condtions
Satisfaction of the flow for this right is determined at the "Murphy Gaging Station" described below.
Water rights 02-00201 and 02-00223 are limited to a combined minimum flow rate of 3,900 CFS average daily flow from April 1 to October 31 as measured at the "Murphy Gaging Station," described below. Water rights 02-00201, 02-00223 and 02-00224 are limited to a combined minimum flow rate of 5,600 CFS average daily flow from November 1 to March 31 as measured at the "Murphy Gaging Station," described below.
1. Average daily flow, as used herein, shall be based upon actual flow conditions; thus, any fluctuations resulting from the operation of Idaho Power Company facilities shall not be considered in the calculation of such flows. Flows of water purchased, leased, owned or otherwise acquired by Idaho Power Company from sources upstream of its power plants, including above Milner Dam, and conveyed to and past its plants below Milner Dam shall be considered fluctuations resulting from the operation of Idaho Power Company facilities. 2. The "Murphy Gaging Station" is located at T01S, R01W, S35, NWSE, Boise Meridian, on the right bank approximately 4.2 miles downstream from Swan Falls Power Plant. 3. For the purposes of the determination and administration of this water right, no portion of the waters of the Snake River or surface or ground water tributary to the Snake River upstream from Milner Dam shall be considered. This water right may not be administered or enforced against any diversions or uses of the waters identified in this paragraph. This partial decree is subject to such general provisions necessary for the definition of the water rights or for the efficient administration of the water rights as may be ultimately determined by the court at a point in time no later than the entry of a final unified decree. I.C. Section 42-1416(6).
Dates
  • Licensed Date :
  • Decreed Date : 9/29/2011
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : 02
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False