| Code |
Condtions |
| X27 |
This right is limited to the irrigation of 146 acres within the place of use described above in a single irrigation season. |
| X35 |
Rights 2-10436 and 2-7168A when combined shall not exceed the irrigation of 184 acres. |
|
Rights 2-10435, 2-10436, 2-7059, 2-7060B, 2-10181, 2-10315, 2-10316, 2-7061, 2-7062, 2-7064, 2-7168A, 2-7168B, 2-7168C, 2-7237A, and 2-7275 when combined shall not exceed a total diversion rate of 48.44 cfs. |
| R65 |
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.5 afa per acre at the field headgate for irrigation of the lands above. |
| X61 |
The period of use for the irrigation described in this approval may be extended to a beginning date of 3/1 provided that beneficial use of the water can be shown and other elements of the right are not exceeded. The use of water before 3/15 is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than 06/15/2009. |
| R05 |
Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 02. |
| R43 |
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s). |
| F06 |
The following rights are diverted through point(s) of diversion described above: 2-7059, 2-7060B, 2-7061, 2-7062, 2-7064, 2-7168A, 2-7168B, 2-7237A, 2-7275, 2-10181, 2-10315, 2-10316, 2-10435, and 2-10436. |
| T07 |
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval. |
| T08 |
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer. |
| T19 |
Pursuant to Section 42-1412(6), Idaho Code, this water right is subject to such general provisions necessary for the definition of the rights or for the efficient administration of water rights as may be determined by the Snake River Basin Adjudication court at a point in time no later than the entry of the final unified decree. |