Priority Date : 12/16/1963
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
SNAKE RIVER
COLUMBIA RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
SNAKE RIVER
07S
13E
11
0
NE
NW
SW
GOODING
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
03/15
11/15
0.24 CFS
56.00 AFA
TOTAL
0.24 CFS
56.00 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (GOODING county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
07S
13E
11
2
NW
NW
2.5
07S
13E
11
3
SW
NW
7.5
07S
13E
11
NW
SW
4.0
Irrigation Totals
Total Acres
Acre Limit
14.00
Conditions
Code
Condtions
R64
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the lands below.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to determine the amount of water diverted from power records and shall annually report the information to the Department.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
C18
This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
S42
The use of water for irrigation under this right may begin as early as February 15 and may continue to as late as November 30, provided other elements of the right are not exceeded. The use of water before March 15 and after November 15 under this remark is subordinate to all water rights having no subordinated early or late irrigation use and a priority date earlier than the date a partial decree is entered for this right.
E55
Right Nos. 2-10284 and 2-10247 are limited to the irrigation of a combined total of 19.6 acres in a single irrigation season.