Water Right Report : 2-100( Decreed/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Attorney MARTEN LAW LLP PO BOX 2139 BOISE ID 83701-2139
Attorney IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070
Current Owner IDAHO POWER COMPANY PO BOX 70 BOISE ID 83707-0070

Water Right Status

Priority Date : 1/17/1900
Basis : Decreed
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
CLEAR LAKE SNAKE RIVER
COVE CREEK MALAD RIVER
MALAD RIVER SNAKE RIVER
SAND SPRINGS CREEK SNAKE RIVER
SNAKE RIVER COLUMBIA RIVER
SNOW BANK SPRINGS SNAKE RIVER
THOUSAND SPRINGS SNAKE RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 02S 01E 18 10 SE SW SE OWYHEE
SNAKE RIVER 02S 01E 18 11 NW SE SE ADA
SNAKE RIVER 06S 12E 7 5 SW NE SE GOODING
SNAKE RIVER 06S 12E 7 10 SW NE SE ELMORE
COVE CREEK 06S 13E 25 0 SW SW GOODING
MALAD RIVER 06S 13E 25 0 SW SW GOODING
MALAD RIVER 06S 13E 35 0 NE NW GOODING
COVE CREEK 06S 13E 35 0 NE NW GOODING Injection
COVE CREEK 06S 13E 35 0 NE NW GOODING Rediversion
MALAD RIVER 06S 13E 36 0 NW NW GOODING
SNAKE RIVER 07S 13E 2 8 SW SW TWIN FALLS
SNAKE RIVER 07S 13E 2 7 SE SW GOODING
SNAKE RIVER 08S 13E 2 1 NW NE GOODING
SNAKE RIVER 08S 13E 2 2 NW NE TWIN FALLS
THOUSAND SPRINGS 08S 14E 8 0 SW NW SE GOODING
THOUSAND SPRINGS 08S 14E 8 0 NE SW SE GOODING
THOUSAND SPRINGS 08S 14E 8 0 NW SW SE GOODING
SNOW BANK SPRINGS 08S 14E 8 0 SE SW SE GOODING
SAND SPRINGS CREEK 08S 14E 17 0 SE NW SE GOODING
CLEAR LAKE 09S 14E 2 7 NE SW SE GOODING
SNAKE RIVER 09S 18E 31 8 NE SW TWIN FALLS
SNAKE RIVER 09S 18E 31 9 NW SW JEROME
SNAKE RIVER 10S 18E 4 3 NE NW TWIN FALLS
SNAKE RIVER 10S 18E 4 2 NW NW JEROME

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 01/01 12/31 2150.00 CFS
TOTAL 2150.00 CFS

Places of Use

Place of Use Legal Description : POWER (ADA,GOODING,TWIN FALLS,JEROME counties)
Township Range Section Lot QQQ QQ Q Acres
02S 01E 18 11 SE SE
06S 12E 7 5 NE SE
06S 13E 27 2 SW SW
06S 13E 35 NE NW
07S 13E 2 7 SE SW
08S 13E 2 4 NW NW
08S 13E 3 1 NE NE
08S 13E 3 3 NW NW
08S 14E 8 3 NE SW
08S 14E 8 3 NE SW
09S 14E 2 7 SW SE
09S 17E 36 15 NE SE
10S 18E 4 3 NE NW

Conditions

Code Condtions
162 Power generation is at Swan Falls Dam Power Plant, Shoshone Falls Power Plant, Twin Falls Power Plant, Bliss Dam Power Plant, Lower Salmon Falls Power Plant, Upper Salmon Falls Power Plant, Lower Malad Gorge Power Plant, Upper Malad Gorge Power Plant, Clear Lake Power Plant and Thousand Spring Power Plant.
1. Water rights nos. 02-100, 02-2032A, 02-4000A, and 02-4001A collectively entitle Idaho Power Company to an unsubordinated water right, except as provided in paragraph nos. 3 and 4 below, to average daily flows of 3900 CFS from April 1 to October 31 and 5600 CFS from November 1 to March 31 as measured at the “Murphy Gaging Station” described below in paragraph no. 2. These flows are not subject to depletion, except for depletions caused by the lawful exercise of those water rights identified in paragraph nos. 3 and 4 below, and except for depletions resulting from any diversions or uses of the water rights identified in paragraph 5 below. Water rights nos. 02-100, 02-2032A, 02-4000A, and 02-4001A are satisfied when the average daily flows set forth herein are met or exceeded. Average daily flow, as used herein, shall be based upon actual flow conditions; thus, any fluctuations resulting from the operation of Idaho Power Company facilities shall not be considered in the calculation of such flows. Flows of water purchased, leased, owned or otherwise acquired by Idaho Power Company from sources upstream of its power plants, including above Milner Dam, and conveyed to and past its plants below Milner Dam shall be considered fluctuations resulting from the operation of Idaho Power Company facilities. Fluctuations resulting from Idaho Power’s operations are the sole exclusion to the rule that all flows actually present at the Murphy Gaging Station constitute actual flow conditions. Flows of water purchased, leased, owned or otherwise acquired by other entities are not considered fluctuations.
2. The “Murphy Gaging Station” is located at latitude 43 degrees 17 minutes 31 seconds, longitude 116 degrees 25 minutes 12 seconds, in T01S R01W, S35, NWNESE, Boise Meridian, Ada County Hydrologic Unit 17050103, on the right bank 4.2 miles downstream from Swan Falls Power Plant, 7.5 miles NE of Murphy, Idaho at river mile 453.5.
3. This water right is subordinate to the lawful exercise of water rights of those persons dismissed from Idaho Power Co. v. State of Idaho, Case No. 81375 (Fourth Judicial Dist. Feb. 16, 1990). (A list of the original dismissed water right holders is made part of the record in SRBA Consolidated Subcase No. 00-92023. The list does not reflect subsequent changes to the original water rights resulting from transfers, splits and renumbering.)
4. This water right is subordinate to all water rights diverting water from the Snake River and surface and groundwater sources tributary to the Snake River, with a priority date senior to October 25, 1984, unless otherwise indicated on the face of individual water rights.
5. For the purposes of the determination and administration of this water right, no portion of the waters of the Snake River or surface or ground water tributary to the Snake River upstream from Milner Dam shall be considered. This water right may not be administered or enforced against any diversions or uses of the waters identified in this paragraph.
6. This partial decree is consistent with the Swan Falls Agreement dated October 25, 1984, the Contract to Implement Chapter 259, Sess. Laws, 1983 dated October 25, 1984 and the Consent Judgments entered in Ada County Civil Cases Nos. 62237 (Mar. 9, 1990) and 81375 (Feb. 16, 1990). The Swan Falls Agreement dated October 25, 1984, shall not be merged into nor integrated with this partial decree, but shall remain in full force and effect independent of this partial decree.
7. This partial decree is subject to such general provisions necessary for the definition of the rights or for the efficient administration of the water rights as may be ultimately determined by the Court at a point in time no later than the entry of a final unified decree. Section 42-1412(6), Idaho Code.
Dates
  • Licensed Date :
  • Decreed Date : 2/12/2012
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal : S
  • Water District Number : 02
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False