Priority Date : 2/4/1893
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
SPRING CREEK
CUB RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
SPRING CREEK
16S
40E
6
0
NW
NW
FRANKLIN
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
4/01
11/01
0.40 CFS
70.00 AFA
STOCKWATER
11/01
4/01
0.15 CFS
7.90 AFA
TOTAL
0.40 CFS
77.90 AFA
Places of Use
Place of Use Legal Description : IRRIGATION (FRANKLIN county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
16S
39E
12
NE
NE
7.0
16S
39E
12
SE
NE
13.0
Place of Use Legal Description : STOCKWATER (FRANKLIN county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
16S
39E
12
NE
NE
16S
39E
12
SE
NE
Irrigation Totals
Total Acres
Acre Limit
20.00
Conditions
Code
Condtions
X35
Rights 13-62, 13-217, 13-7792, and 13-9542 when combined shall not exceed a total diversion rate of 1.14 cfs, a total annual maximum diversion volume of 218 af at the field headgate, and the irrigation of 57 acres.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
R05
Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 13A.
R63
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the place of use.
G23
Diversion of water under this right is limited to the rate available under the priority of this right at the original point of diversion from Spring Creek, located in T15S, R39E, Section 36, SENE.
W68
Use of this right is combined with water from Cub River Irrigation Company over the entire place of use for this right.
004
This right does not grant any right-of-way or easement across the land of another.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
T09
Approval of this transfer does not preclude the opportunity for review of the validity of this water right in the ongoing Bear River Basin Adjudication.