Priority Date : 5/1/1883
Basis : Decreed
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
BATTLE CREEK
BEAR RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
BATTLE CREEK
13S
39E
36
0
NE
NE
FRANKLIN
BATTLE CREEK
14S
39E
9
0
SE
SW
FRANKLIN
BATTLE CREEK
14S
39E
9
0
NW
SE
FRANKLIN
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
IRRIGATION
4/20
9/30
6.00 CFS
TOTAL
6.00 CFS
Places of Use
Irrigation Totals
Total Acres
Acre Limit
Conditions
Code
Condtions
X35
Rights 13-927, 13-928 and 13-2286 when combined shall not exceed a total diversion rate of 32 cfs for irrigation. This combined limit does not include diversion to storage or delivery of storage water.
X35
Rights 13-927, 13-928, 13-929, 13-2183, 13-2286, 13-2290, 13-2203 and 13-2305 when combined shall not exceed the irrigation of 3,300 acres.
R05
Use of water under this right may be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 13M.
R43
The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
R63
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the place of use.
129
Place of use is within the area served by Strong Arm Reservoir Irrigation Company.
172
The boundary encompassing the place of use for this water right is described with a digital boundary as authorized by Idaho law. The data comprising the digital boundary are stored in the electronic document management system of the Department and are incorporated into this approval by this reference. A map depicting the place of use is attached to this approval document to illustrate the place of use described by the digital boundary.
T07
The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08
Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.