Priority Date : 11/4/1999
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
MAPLE GROVE HOT SPRINGS
BEAR RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
MAPLE GROVE HOT SPRINGS
13S
41E
7
0
NE
SW
NE
FRANKLIN
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
1/01
12/31
0.45 CFS
TOTAL
0.45 CFS
Places of Use
Place of Use Legal Description : POWER (FRANKLIN county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
13S
41E
7
SW
NE
Conditions
Code
Condtions
025
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
027
Use of water under this right shall be non-consumptive.
916
The term of this water right license shall extend to 12/31/2019. Prior to the expiration of the term, the Director may issue an order canceling all or any part of the use authorized herein, may establish a new term, or may revise, delete, or add conditions under which the water right license may be exercised. The order shall take effect on the date the current term expires. If the director does not issue such an order, the term shall automatically extend to a length equal to the project's prior term and any prior conditions on the water right license shall remain in effect.
R05
Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 11.
F06
The following rights are diverted through point(s) of diversion described above: 13-7577 and 13-7576.
R22
The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
X35
Rights 13-7577 and 13-7576 when combined shall not exceed a total diversion rate of 0.80 cfs at the field headgate.