Water Right Report : 11-7663( Statutory Claim/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner BARTSCHI LAND LLLP 4545 NOUNAN RD MONTPELIER ID 83254-5006

Water Right Status

Priority Date : 4/15/1942
Basis : Statutory Claim
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
STAUFFER CREEK BEAR RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
STAUFFER CREEK 11S 43E 15 0 NW NW BEAR LAKE

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 04/15 10/31 1.90 CFS
TOTAL 1.90 CFS

Places of Use

Place of Use Legal Description : IRRIGATION (BEAR LAKE county)
Township Range Section Lot QQQ QQ Q Acres
11S 43E 15 NE NE 32.0
11S 43E 15 SE NE 3.0
11S 43E 15 NE NW 2.5
11S 43E 15 NW NW 5.5
11S 43E 15 SW NW 30.0
11S 43E 15 SE NW 19.0
11S 43E 15 NE SW 1.5
11S 43E 15 NW SW 1.5
Irrigation Totals
Total Acres Acre Limit
95.00

Conditions

Code Condtions
01M After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
X58 Approval of Transfer 84837 does not confirm the season of use for Claimed Right 11-7663.
R63 This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the place of use.
004 This right does not grant any right-of-way or easement across the land of another.
T07 The right holder shall accomplish the change authorized by this transfer within one year of the date of this approval.
T08 Failure of the right holder to comply with the conditions of this transfer is cause for the Director to rescind approval of the transfer.
Dates
  • Licensed Date :
  • Decreed Date :
  • Permit Proof Due Date :
  • Permit Proof Made Date :
  • Permit Approved Date :
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 12/16/2009
  • Protest Deadline Date: 12/31/9999
Other Information
  • State or Federal :
  • Water District Number : 11
  • Generic Max Rate Per Acre : 0.02
  • Generic Max Volume Per Acre : 3.5
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False