Water Right Report : 1-7124( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Attorney HOBDEY, CRAIG D HOBDEY LAW OFFICE PLLC 125 5TH AVE W PO BOX 176 GOODING ID 83330-0176
Current Owner AMERICAN FALLS RESERVOIR DISTRICT #2 409 N APPLE ST SHOSHONE ID 83352-5415
Original Owner CONTRACTORS POWER GROUP INC C/O PO BOX 820 TWIN FALLS ID 83303-0820
Previous Owner MILE 28 WATER POWER PROJECT LLC 124 BRIDON WAY JEROME ID 83338

Water Right Status

Priority Date : 9/1/1993
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 10S 21E 28 5 SW NW JEROME

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 04/01 10/31 1300.00 CFS 346000.00 AFA
TOTAL 1300.00 CFS 346000.00 AFA

Places of Use

Place of Use Legal Description : POWER (JEROME county)
Township Range Section Lot QQQ QQ Q Acres
08S 20E 7 NE SW

Conditions

Code Condtions
R22 The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
004 The issuance of this right does not grant any right-of-way or easement across the land of another.
913 The term of this water right shall run concurrently with the Mile 28 Hydrolelectric Project license, Docket Number P-10552, issued by the Federal Energy Regulatory Commission (FERC), which expires on August 1, 2042. The term shall automatically extend to run concurrently with any annual renewals of the project's FERC license. Prior to the issuance of a subsequent or new FERC license for the project, the Director may review the water right license and may issue an order canceling all or any part of the use, establishing a new term, or revising, adding or deleting conditions under which the water right may be exercised. The order shall take effect on the date the current term, as may be extended through annual renewals, expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the project's subsequent or new FERC license and any prior conditions on the water right license shall remain in effect.
This water right does not convey any authority to require or demand the diversion of water into the Milner-Gooding Canal and only authorizes the use of water which has been diverted into the canal under other existing water rights
Water used under this right shall be returned undiminished to the canal without interfering with the operation of the canal for its primary purpose of supplying irrigation water.
027 Use of water under this right shall be non-consumptive.
Dates
  • Licensed Date : 12/13/2018
  • Decreed Date :
  • Permit Proof Due Date : 12/1/1995
  • Permit Proof Made Date : 10/13/1995
  • Permit Approved Date : 12/27/1993
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date: 9/1/1993
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : 01
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False