Priority Date : 9/1/1993
Basis : License
Status : Active
Water Source
Source
Source Qualifier
Tributary
Tributary Qualifier
SNAKE RIVER
COLUMBIA RIVER
Points Of Diversion (Location)
Source
Township
Range
Section
Govt. Lot
QQQ
QQ
Q
County
Diversion Type
SNAKE RIVER
10S
21E
28
5
SW
NW
JEROME
Water Uses
Beneficial Use
From
To
Diversion Rate
Volume
POWER
04/01
10/31
1300.00 CFS
346000.00 AFA
TOTAL
1300.00 CFS
346000.00 AFA
Places of Use
Place of Use Legal Description : POWER (JEROME county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
08S
20E
7
NE
SW
Conditions
Code
Condtions
R22
The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
025
This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
004
The issuance of this right does not grant any right-of-way or easement across the land of another.
913
The term of this water right shall run concurrently with the Mile 28 Hydrolelectric Project license, Docket Number P-10552, issued by the Federal Energy Regulatory Commission (FERC), which expires on August 1, 2042. The term shall automatically extend to run concurrently with any annual renewals of the project's FERC license. Prior to the issuance of a subsequent or new FERC license for the project, the Director may review the water right license and may issue an order canceling all or any part of the use, establishing a new term, or revising, adding or deleting conditions under which the water right may be exercised. The order shall take effect on the date the current term, as may be extended through annual renewals, expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the project's subsequent or new FERC license and any prior conditions on the water right license shall remain in effect.
This water right does not convey any authority to require or demand the diversion of water into the Milner-Gooding Canal and only authorizes the use of water which has been diverted into the canal under other existing water rights
Water used under this right shall be returned undiminished to the canal without interfering with the operation of the canal for its primary purpose of supplying irrigation water.
027
Use of water under this right shall be non-consumptive.