Water Right Report : 1-7010-D ( License/Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner HAZELTON WILSON JOINT VENTURE PO BOX 7867 BOISE ID 83707
Original Owner NORTH SIDE CANAL COMPANY LTD 731 GOLF COURSE RD JEROME ID 83338-6453
Trustee LAND TITLE & ESCROW INC PO BOX 349 JEROME ID 83338-0349

Water Right Status

Priority Date : 3/30/1977
Basis : License
Status : Active

Water Source

Source Source Qualifier Tributary Tributary Qualifier
SNAKE RIVER COLUMBIA RIVER

Points Of Diversion (Location)

Source Township Range Section Govt. Lot QQQ QQ Q County Diversion Type
SNAKE RIVER 10S 21E 28 5 SW NW JEROME
SNAKE RIVER 10S 21E 28 5 SW NW JEROME

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 03/15 11/15 3000.00 CFS 817300.00 AFA
TOTAL 3000.00 CFS 817300.00 AFA

Places of Use

Place of Use Legal Description : POWER (JEROME county)
Township Range Section Lot QQQ QQ Q Acres
09S 19E 24 SE NE

Conditions

Code Condtions
This water right authorizes the generation of power only when the water is diverted from the Snake River under rights for irrigation or other authorized purposes.
915 The term of this water right license shall run concurrently with energy sales agreement Case Number IPC-E-90-21, Order Number 23570 approved by the Idaho Public Utilities Commission, which expires on December 25, 2021. Prior to the expiration of the term, the Director may issue an order canceling all or any part of the use authorized herein, may establish a new term, or may revise, delete, or add conditions under which the water right license may be exercised. The order shall take effect on the date the current term expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the prior term and any prior conditions on the water right license shall remain in effect.
R22 The rights for the use of water confirmed in this license shall be junior and subordinate to all rights for the use of water other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any right or claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this right.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
R43 The right holder shall maintain a measuring device and lockable controlling works of a type approved by the Department in a manner that will provide the watermaster suitable control of the diversion(s).
R05 Use of water under this right will be regulated by a watermaster with responsibility for the distribution of water among appropriators within a water district. At the time of this approval, this water right is within State Water District No. 1.
027 Use of water under this right shall be non-consumptive.
Power use locally known as the Wilson Lake project.
The total combined diversion rate for Right 01-7010B (Bypass Limited) and Right 01-7010D (Wilson Lake) is 3000.00 cfs. Water is first used for power generation pursuant to Right 01-7010B, and then it is used again for power generation pursuant to Right 01-7010D.
Dates
  • Licensed Date : 10/28/2015
  • Decreed Date :
  • Permit Proof Due Date : 5/1/1994
  • Permit Proof Made Date : 8/31/1993
  • Permit Approved Date : 6/29/1977
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Application Recevied Date:
  • Protest Deadline Date:
Other Information
  • State or Federal :
  • Water District Number : 130
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Combined Acre Limit :
  • Combined Volume Limit:
  • Combined Rate Limit: 3000.00
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False