Place of Use Legal Description : IRRIGATION (WASHINGTON county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
12N
02W
5
1
NE
NE
40.0
12N
02W
5
2
NW
NE
35.0
13N
02W
32
SW
SE
40.0
13N
02W
32
SE
SE
20.0
Irrigation Totals
Total Acres
Acre Limit
135.00
Conditions
Code
Condtions
26A
Project construction shall commence within one year from the date of permit issuance and shall proceed diligently to completion unless it can be shown to the satisfaction of the Director of the Department of Water Resources that delays were due to circumstances over which the permit holder had no control.
R64
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 4.0 afa per acre at the field headgate for irrigation of the place of use.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
121
The Director retains jurisdiction to require the right holder to provide purchased or leased natural flow or stored water to offset depletion of Lower Snake River flows if needed for salmon migration purposes. The amount of water required to be released into the Snake River or a tributary, if needed for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this permit.