Place of Use Legal Description : IRRIGATION (ADA county)
Township
Range
Section
Lot
QQQ
QQ
Q
Acres
04N
01E
5
NE
SW
40.0
04N
01E
5
NW
SW
10.0
04N
01E
5
SW
SW
39.0
04N
01E
5
SE
SW
5.0
Irrigation Totals
Total Acres
Acre Limit
94.00
Conditions
Code
Condtions
X27
This right is limited to the irrigation of 15.0 acres within the authorized place of use in a single irrigation season.
R61
This right when combined with all other rights shall provide no more than 4.5 afa per acre at the field headgate for irrigation of the place of use.
WB7
This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor exceed a combined annual maximum diversion volume of 67.5 af at the field headgate for the place of use.
943
The right holder shall make full beneficial use of all surface water available to the right holder for irrigation of lands within the authorized place of use for this right. The right holder may divert ground water under this right to irrigate land with appurtenant surface water rights when the surface water supply is not reasonably sufficient to irrigate the place of use for this water right or is not available due to drought, curtailment by priority, or the seasonal startup and shutoff or maintenance schedule for canal company deliveries. The right holder shall not divert ground water for irrigation purposes under this right if use of the surface water supply is intentionally discontinued or reduced (for example abandoned, forfeited, sold, disallowed by court decree, or leased to the Water Supply Bank), or is not deliverable due to non-payment of annual assessments, without an approved transfer pursuant to Section 42-222, Idaho Code, or other Department approval.
01M
After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
930
Water bearing zone to be appropriated is 200 to 400 feet.
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
X60
Place of use is located within Corrente Bello Subdivision Nos 1 and 2.
004
This right does not grant any right-of-way or easement across the land of another.
26A
Project construction shall commence within one year from the date of permit issuance and shall proceed diligently to completion unless it can be shown to the satisfaction of the Director of the Department of Water Resources that delays were due to circumstances over which the permit holder had no control.
121
The Director retains jurisdiction to require the right holder to provide purchased or leased natural flow or stored water to offset depletion of Lower Snake River flows if needed for salmon migration purposes. The amount of water required to be released into the Snake River or a tributary, if needed for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this permit.