Project construction shall commence within one year from the date of permit issuance and shall proceed diligently to completion unless it can be shown to the satisfaction of the Director of the Department of Water Resources that delays were due to circumstances over which permit holder had no control.
058
The point of diversion identified in this right is located within the boundaries of the Boise Front Low Temperature Geothermal Resource Groundwater Management Area. The well driller shall monitor water temperatures while drilling the well. If water with a temperature greater than 85 degrees Fahrenheit is encountered by the driller, drilling must immediately cease, and the Department must be notified. Drilling shall not resume until the Department has reviewed the drilling conditions, and established standards for construction with the driller.
01M
After specific notification by the department, the right holder shall install a suitable measuring device or shall enter into an agreement with the department to determine the amount of water diverted from power records and shall annually report the information to the department.
46B
The right holder shall comply with Idaho well construction standards when constructing a well pursuant to this right.
004
The issuance of this right does not grant any right-of-way or easement across the land of another.
046
Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code.
Place of use is within the United Water Idaho, Inc. area of certification in and around the City of Boise.