Water Permit Report: 55-13910(Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner MORGAN RANCHES LLC C/O DAVID RUTAN PO BOX 277 JORDAN VALLEY OR 97910-0277
Current Owner RUTAN, DAVID PO BOX 277 JORDAN VALLEY OR 97910

Water Permit Status

Priority Date : 9/27/2012
Status : Active

Water Source

Source Tributary Tributary Qualifier
GROUND WATER

Points Of Diversion (Location)

Source Township Range Section QQQ QQ Q County Diversion Type
GROUND WATER 06S 05W 19 SW NW OWYHEE
GROUND WATER 06S 05W 19 NE SW OWYHEE
GROUND WATER 06S 05W 19 NW SW OWYHEE
GROUND WATER 06S 05W 19 NW SW OWYHEE

Water Uses

Beneficial Use From To Diversion Rate Volume
IRRIGATION 04/01 10/31 4.50 CFS
TOTAL 4.50 CFS

Places of Use

Place of Use Legal Description : IRRIGATION (OWYHEE county)
Township Range Section Lot QQQ QQ Q Acres
06S 05W 18 3 NW SW 20.0
06S 05W 18 4 SW SW 34.0
06S 05W 19 1 NW NW 22.0
06S 05W 19 2 SW NW 15.0
06S 05W 19 NE SW 11.0
06S 05W 19 3 NW SW 24.0
06S 06W 13 NE SE 15.0
06S 06W 13 SE SE 7.0
06S 06W 24 NE NE 27.0
06S 06W 24 SE NE 40.0
06S 06W 24 NE SE 10.0
Irrigation Totals
Total Acres Acre Limit
225.00

Conditions

Code Condtions
R63 This right when combined with all other rights shall provide no more than 0.02 cfs per acre nor more than 3.5 afa per acre at the field headgate for irrigation of the place of use.
01M After specific notification by the Department, the right holder shall install a suitable measuring device or shall enter into an agreement with the Department to use power records to determine the amount of water diverted and shall annually report the information to the Department.
To prevent injury to prior water rights appropriating water from Jordan Creek and/or the underlying shallow aquifer tributary to Jordan Creek, the new wells used as points of diversion for this water right shall be constructed and maintained with unperforated casing and sealed into the first significant confining layer located 200 feet or more below ground surface.
046 Right holder shall comply with the drilling permit requirements of Section 42-235, Idaho Code and applicable Well Construction Rules of the Department.
004 This right does not grant any right-of-way or easement across the land of another.
26A Project construction shall commence within one year from the date of permit issuance and shall proceed diligently to completion unless it can be shown to the satisfaction of the Director of the Department of Water Resources that delays were due to circumstances over which the permit holder had no control.
121 The Director retains jurisdiction to require the right holder to provide purchased or leased natural flow or stored water to offset depletion of Lower Snake River flows if needed for salmon migration purposes. The amount of water required to be released into the Snake River or a tributary, if needed for this purpose, will be determined by the Director based upon the reduction in flow caused by the use of water pursuant to this permit.
Dates
  • Licensed Date :
  • Decreed Date :
  • Permit Proof Due Date : 3/1/2023
  • Permit Proof Made Date : 3/24/2023
  • Permit Approved Date : 3/22/2013
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Water Supply Bank Enrollment Date Accepted :
  • Water Supply Bank Enrollment Date Removed :
  • Application Recevied Date: 9/4/2012
  • Protest Deadline Date: 2/25/2013
Other Information
  • State or Federal :
  • Water District Number : EXC
  • Generic Max Rate Per Acre : 0.02
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust :
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False