Water Permit Report: 47-17633(Active)

Water Right Owners

Owner Type Name Address City State Postal Code
Current Owner SHAWPATIN AGCAP LLC PO BOX 446 TWIN FALLS ID 83303-0446
Original Owner OSTRANDER, MARY D 9244 S RILEY CREEK AVE KUNA ID 83634
Original Owner WHITE, TERRY G 9244 S RILEY CREEK AVE KUNA ID 83634-5329

Water Permit Status

Priority Date : 12/23/2014
Status : Active

Water Source

Source Tributary Tributary Qualifier
MUD CREEK SNAKE RIVER

Points Of Diversion (Location)

Source Township Range Section QQQ QQ Q County Diversion Type
MUD CREEK 09S 14E 28 NE NW TWIN FALLS

Water Uses

Beneficial Use From To Diversion Rate Volume
POWER 01/01 12/31 25.00 CFS
TOTAL 25.00 CFS

Places of Use

Place of Use Legal Description : POWER (TWIN FALLS county)
Township Range Section Lot QQQ QQ Q Acres
09S 14E 28 NW NE

Conditions

Code Condtions
Proof of application of water to beneficial use shall be submitted no sooner than February1, 2019, and received no later than the beneficial use due date of July 1, 2019, unless the Department approves a request for extension of time to submit proof of beneficial use.
To facilitate determination of the volume of water beneficially used by this project, the right holder shall provide IDWR a copy of the characteristic performance curve for the turbine(s) and a copy of the monthly generation from the development period. These items shall be submitted with the required Proof of Beneficial Use statement. Failure to submit these items shall be cause for the Director to reject the Proof of Beneficial Use statement.
027 Use of water under this right shall be non-consumptive.
004 This right does not grant any right-of-way or easement across the land of another.
01N The right holder shall install a measuring device that can be used to determine the instantaneous rate of flow of water through the system, or the right holder shall provide to the department a flow rate measurement or computation made by a certified water right examiner in accordance with actual system design and operation.
025 This right does not constitute Idaho Public Utilities Commission or Federal Energy Regulatory Commission approval that may be required.
08A This right is subject to the provisions of Sections 42-205 through 42-210, Idaho Code, restricting the sale, transfer, assignment, or mortgage of this right. Failure to comply with these provisions is cause for immediate cancellation of this right.
17H The rights for the use of water acquired under this right shall be junior and subordinate to all other rights for the use of water, other than hydropower, within the State of Idaho that are initiated later in time than the priority of this right and shall not give rise to any claim against any future rights for the use of water, other than hydropower, within the State of Idaho initiated later in time than the priority of this permit.
915 The term of this permit shall run concurrently with energy sales agreement IPUC CaseNo. U-1006-271, OrderNo. 19849 approved by the Idaho Public Utilities Commission, which expires on April 15, 2020. Prior to the expiration of the term, the Director may issue an order canceling all or any part of the use authorized herein, may establish a new term, or may revise, delete, or add conditions under which the water right permit or subsequent water right license may be exercised. The order shall take effect on the date the current term expires. If the Director does not issue such an order, the term shall automatically extend to a length equal to the prior term and any prior conditions on the water right permit or subsequent water right license shall remain in effect.
051 Any license issued by IDWR pursuant to the right or portion thereof for the use of trust water is subject to a term review 5 years after the date of this approval to determine availability of water for the use and to re-evaluate the public interest at the end of the term.
Dates
  • Licensed Date :
  • Decreed Date :
  • Permit Proof Due Date : 7/1/2027
  • Permit Proof Made Date :
  • Permit Approved Date : 6/15/2015
  • Permit Moratorium Expiration Date :
  • Enlargment Use Priority Date :
  • Enlargement Statute Priority Date :
  • Water Supply Bank Enrollment Date Accepted :
  • Water Supply Bank Enrollment Date Removed :
  • Application Recevied Date: 12/23/2014
  • Protest Deadline Date: 2/23/2015
Other Information
  • State or Federal :
  • Water District Number : NWD
  • Generic Max Rate Per Acre : 0
  • Generic Max Volume Per Acre : 0
  • Civil Case Number :
  • Decree Plantiff :
  • Decree Defendant :
  • Swan Falls Trust or Nontrust : T
  • Swan Falls Dismissed :
  • DLE Act Number :
  • Cary Act Number :
  • Mitigation Plan: False